- Location
Birmingham - Sector
Commercial Office Development - Main Client
Ballymore Group - Main Contractor
Building 1: Kier Group; Building 2: Balfour Beatty; Building 3: BAM Construction - Architect & Engineer
Building 1: Arup; Building 2: Curtins Consulting Engineers; Building 3: WSP - Steelwork Contractor
Building 1: Barrett Steel Buildings; Building 2: Caunton Engineering, Building 3: Severfield NI - Westok Solution
Building 1: 700T Westok Cellular Beams; Building 2: 1000T Westok Cellular Beams; Building 3: 1275T Westok Cellular Beams
Largest office development outside London
Kloeckner Metals UK | Westok are incredibly proud to have been the design solution of choice on all 3 buildings on this prestigious Commercial Office Development right in the heart of Birmingham’s business district.
After the success of two award winning buildings which are fully occupied with blue chip tenants such as Barclays, KPMG and the UK Headquarters of HS2, the construction of the third and final building is well underway which will provide a further 420,00 sq ft of office space making 1020,000 sq ft across the total scheme. The £200 million scheme is said to be the largest ever speculative city centre office scheme built outside London.
Supply chain collaboration
Westok worked closely with the steelwork fabricators and project stakeholders on each building to ensure the optimum design solution was realised.
Westok provide future proof design solutions
Westok Cellular Beams enabled a long span, column free design solution which provided flexibility for modern and evolving work styles with each building boasting unique work spaces to excite, inspire and assist productivity.